LNGC PowerShip conversion

Conversion of 290 m LNGC (150,650 m3) to FSRU cum Power Generation:

 

The following new Installations envisaged for the mentioned conversions :

- 2 x 100 MW Gas Turbine + 1 x 100 MW Steam Turbine + 2 x HRSG unit

- 1 x Re Gasification plant

- Aux. system for Turbine (Air Intake, Water Cooling, Fuel Gas, Steam etc.)

- Aux. equipment Compressor, deck crane, Condenser