LNGC to FSU conversions

Conversion of 270 m LNG Carrier with 127k m3 capacity to FSU. 

Complete basic and class drawings were prepared with below scope:

- LNG System design

- LNG Flow analysis, BoG calculation and pipe stress analysis

- Deck fitting installation like QRH, additional mooring fittings. 

-Replacement of existing cargo pump with feed pump. 

- Manifold modification for continuous discharge of liquid, STS operation.

- Modification to electrical system to run on shore based power.