Specification compatibility: The drawings will be checked for compliance TO the contract specification of the vessel.
 
Rules & Regulation : The drawing will be commented & modified to meet all the applicable. Classification/Administration Rules and Regulation and recommendations till date as applicable
 
Safety & Operational Aspect: The drawings will be reviewed for safety & Operational aspects.
 
Adequacy of information provided: Vedam will ensure that all the drawings approved provide all the information required for review of drawing and construction of vessel.
 
Suggestion for improved design: In case of inefficient design proposed by yard, Vedam will suggest, on behalf of owners, an improved, practical design.
 
Quality & Standards: The drawings will be checked for the consistency of quality of presentation and standards used.
 
Oil Major Recommendations: We will use our experience with OCIMF and oil major requirements to ensure compliance at the drawing / design stage itself.

TIMELINE FOR APPROVAL PROCESS

In general, the drawings and comments will be returned within three (3) weeks of time after receiving the drawing.

 

PROJECT HANDLING

Inspection Process: To ensure high quality standards during construction process we have developed a detailed NB procedures and Inspection Checklist, which is mandatory to be complied with that will be reference tool during construction of the vessels.
 
Site Supervision Team:
• Site Manager
• Hull Superintendent/Naval Architects
• Coating Superintendent
• Machinery Superintendent
• Electrical Superintendent
• Navigation/Network Engineer
• Secretary
 
Reporting System:
• Daily Reporting System (Internal)
• Weekly Reporting
• Monthly Reporting
 
We are in process of developing a progress and construction reporting system on the web, which will be available to owners at any time as and when required.