8000 DWT MBC's - CFD for Hull Optimization

Work Scope

Modify & Analyze  a more efficient hull form for 4 nos. of 8000T MBCs as per constraints mentioned by client.

Use 885KW engines for arriving at the design speed of 10 knots with 10% sea margin

Perform CFD analysis to optimize the hull form based on resistance.